Darlington Hills Residence

Darlington, WA

Darlington Hills Residence

A multi award-winning Perth Hills residence where SIPs Industries supplied and installed the complete SIPs envelope in two weeks, achieving 2.0 ACH airtightness and a full five-month build from slab to completion.

(SIPS) Structured Insulated Panels

14 DAYS TO SHELL

Full structural shell erected and weathertight, from slab to lockup.

STAR RATING

Independently assessed NatHERS energy rating, well above the minimum standard.

5 Months Build Time

From slab to practical completion, ahead of traditional construction timelines.

M² CUSTOM HOME

Supply and install solution, fully engineered and manufactured to specification.

PROJECT OVERVIEW

Darlington Hills Residence
Darlington Hills Residence

A multi award-winning Perth Hills residence where SIPs installation was completed in weeks.

When planning began for this residence in the Perth Hills suburb of Darlington, the brief called for a home that could meet premium performance targets across airtightness, thermal comfort and energy efficiency while sitting comfortably within its bush setting. The project used a hybrid SIPs construction system, requiring close coordination between the SIPs scope and the broader build program to ensure the panel installation integrated cleanly with the other structural and service elements.


SIPs Industries supplied and installed the SIPs component of the build, completing the panel installation in two weeks. The kit was designed to deliver a highly airtight and insulated building envelope as the foundation for the double glazing, heat recovery ventilation and fully electric solar-powered systems specified for the project.

THE RESULT

The completed home achieved an airtightness result of 2.0 ACH, significantly below the NCC baseline assumption of 10. The full build was complete in five months. The project was awarded HIA GreenSmart Project Home of the Year, recognising the performance outcome as a benchmark for residential construction.

The completed home achieved an airtightness result of 2.0 ACH, significantly below the NCC baseline assumption of 10. The full build was complete in five months. The project was awarded HIA GreenSmart Project Home of the Year, recognising the performance outcome as a benchmark for residential construction.

Darlington Hills Residence

(SIPS) Structured Insulated Panels

Darlington Hills Residence